Choosing the right approach
Floor preparation begins by surveying the existing substrate and the target finished levels. Distinguish local smoothing from a new screed and agree how both connect to doorways, stairs and adjoining rooms. Identify services, floor-heating components and movement joints that affect the build-up. The chosen product system must suit the substrate and intended finish, with drying and readiness checks built into the programme.
What the specification should cover
- Existing substrate survey
- Finished level schedule
- Screed or smoothing specification
- Heating and joint coordination
- Readiness for the chosen floor finish
The top surface is only part of the floor
Work backwards from the final floor height, allowing for the chosen finish and its fixing layers. A thicker stone tile and a thinner timber floor may need different preparation in adjoining rooms. Check the first stair riser and door bottoms against the combined build-up before pouring or levelling.
Questions about screeds & floor levelling
When can the final floor be installed on a new screed?
Use the requirements of the actual screed, adhesive and floor finish, supported by the appropriate site checks. Thickness, conditions and any heating protocol affect the sequence. A surface that looks dry is not enough to confirm readiness.
Plan this work for your location
Use the local planning brief to discuss access, the existing property and coordination before a quotation.
