Create the final layout first, then divide the work into logical packages. Group disruptive hidden work together where practical. Include repeated protection, mobilisation and temporary arrangements in the comparison. A phased plan works when each stage supports the same end result rather than becoming a separate design.
Three decisions to get right
- Approve the measured layout before finalising technical drawings.
- Coordinate installations before closing walls and ceilings.
- Schedule protection and inspection before finishing work.